Who may do what
Visual inspection of leads and equipment, and reporting faults, can be done by any trained worker. Electrical installation work, repairs, and work on or near live parts are restricted to licensed or otherwise authorised electrical workers, and the restrictions are set by the electrical safety law in your jurisdiction as well as by the Health and Safety at Work etc. Act 1974.
Nothing in this checklist authorises anyone to open equipment, work on a switchboard or repair a lead. If a check fails, the equipment comes out of service and a licensed electrician is engaged.
Leads, plugs and portable equipment
- No cuts, nicks, crushing, melting or exposed conductors on any flexible lead
- Plugs and sockets undamaged, with no cracked bodies, bent pins or scorch marks
- No taped repairs anywhere on a lead. A taped lead is removed from service, not patched
- Cord grips intact, with no conductors visible where the cord enters plug or appliance
- Leads are not run through doorways, under mats or across walkways where they can be crushed or create a trip hazard
- Leads are not coiled tightly while carrying load, which causes heating
- Double adaptors and piggyback plugs are not in use
- Power boards are the type with overload protection, are not daisy chained, and are not overloaded
- Equipment is suited to the environment, including wet, dusty or outdoor areas
- Portable equipment is switched off and unplugged when not in use where appropriate
Residual current devices
RCDs are the control that turns a fault into a nuisance instead of a fatality, but only if they still work. Record the push-button test, and note that a push-button test is not the same as the periodic test by an electrician.
- RCD protection is provided where required for the circuits and equipment in use
- Push-button tests are done at the interval in your procedure and the results recorded
- Any RCD that fails to trip on test is reported and the circuit taken out of service
- Workers know where the RCDs and isolation points are, and how to isolate in an emergency
| RCD location or circuit | Type | Push-button test date | Result | Last electrician test | Next due |
|---|---|---|---|---|---|
Switchboards and fixed installation
- Switchboards are closed, secured and free of stored items
- Clear access is maintained in front of every board, and the space is not used for storage
- Circuits are labelled legibly and the labelling matches reality
- No signs of overheating, scorching, arcing, burning smell or buzzing
- No exposed live parts, missing blanks or unsecured covers
- Board is protected from water ingress and mechanical damage
- Emergency isolation points are identified, accessible and unobstructed
- Periodic inspection of the fixed installation is current, and the report is on file
Test and tag register
Testing intervals depend on the equipment, the environment and the requirements that apply in your jurisdiction, and are shorter in harsh environments such as construction. Record the interval you are applying and its source rather than assuming an annual cycle.
| Item and asset number | Location | Test interval applied | Last tested | Result | Next due | Tester |
|---|---|---|---|---|---|---|
Work practices
- Nobody works on or near live parts except where it is unavoidable, authorised and controlled
- Isolation and lock-out procedures are used and understood, and isolation is verified by test
- Damaged equipment is tagged out and physically removed from service, not left plugged in
- Faults are reported through a route people actually use, and repairs are done by licensed workers
- Location of buried and concealed services is confirmed before drilling, cutting or excavating
- Overhead powerline clearances are checked before plant, ladders or scaffold are moved
- Workers know what to do if someone is in contact with electricity: isolate first, never touch the person, then call 999
- Emergency response and first aid arrangements cover electric shock, including that anyone shocked is medically assessed
Faults found and actions
| Item and location | Fault | Action taken now | Referred to electrician (Y/N) | Owner | Date cleared |
|---|---|---|---|---|---|